Red Rock Rail Photo Gallery

 1  |  2  |  3  |  4  |  5  |  6  |  7  | Page 8 |  9  |  10  |  11  |  12 



First 270° of the helix. (8/19/2001)


First 270° of the helix. (8/19/2001)


Upper track is beginning of helix; lower track is Greycliffe staging. (8/19/2001)


East Colville yard limits, where the track goes from double track to single track (8/19/2001)


John Galt Line power leads a manifest train into the hole at Flaxler. (6/24/2001)


The east portal of Carpel Tunnel. (6/24/2001)


Rounding the curve past the Gateway Ranch Dairy, downhill into Carpel Tunnel. (6/24/2001)


A six-pack of Dan's power posing for a photo opportunity in the yard. (6/24/2001)


A six-pack of Dan's power posing for a photo opportunity in the yard. (6/24/2001)


Colville yard is already a busy place on an otherwise lazy Sunday morning. (6/24/2001)


Crew change time at Colville. (6/24/2001)


Crew change time at Colville. (6/24/2001)

 1  |  2  |  3  |  4  |  5  |  6  |  7  | Page 8 |  9  |  10  |  11  |  12 



Copyright © 2002-2003 Jim Deahl. All rights reserved.

http://www.big-deahl.com/rrr/
Updated: July 29, 2003
Questions or Comments? E-mail the webmaster