Red Rock Rail Photo Gallery

 1  |  2  |  3  |  4  |  5  |  6  | Page 7 |  8  |  9  |  10  |  11  |  12 



A Southern Pacific SD70M gets some shop time at the Colville Engine Terminal. (11/11/2001)


Another view of the visiting John Galt Line power at the Colville Engine Terminal. (11/11/2001)


A pair of visiting John Galt Line GP38-2's get some gas at the Inbound Fuel Track while a pair of JGL Dash8-40B's await their turn on the afternoon Z-train. (11/11/2001)


Colville Engine Terminal shop building and locomotive servicing area. (11/11/2001)


Colville Engine Terminal shop building and locomotive servicing area. (11/11/2001)


Aerial view of the completed helix. (9/30/2001)


Completed helix (bottom loop is Greycliffe staging). (9/30/2001)


Completed helix (bottom loop is Greycliffe staging). The helix climbs 16.5" in 3-1/2 loops, at a grade of 2.6%. (9/30/2001)


Helix under construction. (8/26/2001)


Helix under construction. (8/26/2001)


Helix under construction. (8/19/2001)


Helix under construction. (8/19/2001)

 1  |  2  |  3  |  4  |  5  |  6  | Page 7 |  8  |  9  |  10  |  11  |  12 



Copyright © 2002-2003 Jim Deahl. All rights reserved.

http://www.big-deahl.com/rrr/
Updated: July 29, 2003
Questions or Comments? E-mail the webmaster